- Installation of two GSU transformers
- New medium voltage station switchgear and installation of medium voltage generator leads
- Installation of two 115kV air insulated circuits tieing the National Grid substation to Bellows Falls generation.
- Control, integration, and relay protection upgrades.
Market(s): Renewable Energy