- Electrical reconstruction and upgrade of a 1909-built hydropower plant consisting of the replacement of four of 10 existing turbines.
- The project increased the output of the plant by approximately 8MW, bringing the total output of this facility to 36MW
- The existing turbines remained a reliable power source to the electrical grid throughout construction.
Market(s): Renewable Energy