Building a Brighter Future
Connect With Us:
Building a Brighter Future
Connect With Us:

Bellows Falls Hydro Plant

Location:Rockingham, VT
Owner:TransCanada Hyrdo Northeast
Client:TransCanada Hydro Northeast
Status:Completed
  • Installation of two GSU transformers
  • New medium voltage station switchgear and installation of medium voltage generator leads
  • Installation of two 115kV air insulated circuits tieing the National Grid substation to Bellows Falls generation.
  • Control, integration, and relay protection upgrades.

Market(s): Renewable Energy