- Relocation of existing campus utilities
- CAD/BIM design and coordination
- Installed new site grounding and utility duct banks
- Installed new building’s lighting, fire alarm and gas detection systems
- Installed new plant control systems, 15 kV campus distribution feeds, switchgear, boilers, and standby generators
Market(s): Central Utility Plant (CUP)