Peabody & Ipswich River Substation Line Work

Location:Peabody, MA
Client:Peabody Municipal Light Plant
Status:Completed June 2019
  • Installed a 336.4 spacer cable on the new poles and interconnected a 5 mile, 144 strand fiber cable between the Ipswich River and Johnson Substations, then to PMLP’s Office.

Market(s): Distribution Line