- Electrical construction of the 1600 MW combined cycle power plant
- EPC of units 8 and 9 and GSU bushing replacement
- Installed three 250 MW, 345kV solid dielectric circuits. Was the first solid dielectric cable installation in the United States and included nine cable to air terminations and nine cable to gas bus terminations.
- Service: Preventive maintenance, technology upgrades on equipment, electrical repairs and installations, and special projects.
Market(s): Power Generation, EPC, Service/Maintenance