Cambridge Central Utility Plant

Location:Cambridge, MA
Owner:Undisclosed
Client:Bond Brothers
Status:Completed July 2015
  • Upgraded four existing chilled water pumps.
  • The new, 500HP electric chilled water pumps, controlled via four new stand-alone, glycol cooled VFD units remotely located, have increased the capacity of the system as designed.
  • Existing conduit racks and cable trays were used to route power throughout the plant and were required to be systematically isolated, de-energized, temporarily re-routed, tested and re-energized while the newly designed electrical system was built.

Market(s): Central Utility Plant (CUP)