- Completed installation and testing all above ground electrical systems for two GE LMS100 CTGs, balance of plant, and associated equipment.
- The scope of work included raceway installation (cable tray and conduit), power, control and instrumentation cable installation, and cable terminations throughout the plant.
- Build out the gas compressor building adjacent to the new plant
- Service: Preventive Maintenance, technology upgrades on equipment, electrical repairs, and installations
Market(s): Power Generation, Service/Maintenance