Medway Power Plant 200MW Peaking Station

Location:Medway, MA
Owner:Exelon
Client:Gemma Power
Status:Completed
  • Completed installation and testing all above ground electrical systems for two GE LMS100 CTGs, balance of plant, and associated equipment.
  • The scope of work included raceway installation (cable tray and conduit), power, control and instrumentation cable installation, and cable terminations throughout the plant.
  • Build out the gas compressor building adjacent to the new plant
  • Service: Preventive Maintenance, technology upgrades on equipment, electrical repairs, and installations

Market(s): Power Generation, Service/Maintenance