Completed the Everett Substation re-build project while acting as the prime contractor.
Installation of two 45/60/75 MVA, 115/24kV transformers, two neutral grounding reactors, two 115kV circuit switchers, tow 34.5kv air-break switches, and two 115kv strain bus.
Installation of a line-up of prefabricated relay and control panels in the new control house.