- EPC project that included the construction of:
nine-breaker 345kV GIS ring station: two 345kV line positions, four 400MVA 345/115kV autotransformers
11-breaker 115kV GIS ring station: six 115kV line positions, complete with system one and system two relay protection and control
- State Electric met the expedited six-week 115kV GIS ring station project with 24/7 shifts of three crews expending 30,000 craft hours.
Market(s): Substation, EPC