Building a Brighter Future
Connect With Us:
Building a Brighter Future
Connect With Us:

Site 5

Location:Cambridge, MA
Owner:Undisclosed
Client:Turner Construction
Square Feet:320,000
Stories:18
Status:Ongoing
  • State Electric is responsible for installing the base building structured cabling system to include a fiber optic backbone and all telecommunication room buildouts.

Market(s): Tel/Data